Dry Creek Wastewater Treatment Plant Levee Relocation

Roseville, California

Foothill Associates conducted an arborist survey along the Dry Creek levee at the Roseville Wastewater Treatment Plant in Roseville, California. The survey included tagging and mapping trees, as well as collecting data on their size, species, and health. Tree locations were mapped with a GPS unit, comprised of 223 trees, including native oak and native riparian trees. After completing the tree survey, Foothill Associates prepared an estimate of potential tree impacts and required mitigation. Foothill Associates also prepared environmental documents, secured permits, and developed restoration plans.

DryCreekWWTP_06

223 trees were surveyed and mapped to develop an estimate of potential tree impacts and required mitigation.